Cocoa Beach Plumbing will be taking pictures and cleaning the sewer lines in the North and South buildings.
This operation will take place from 3 February until 17 February 2025.
Please be aware that a fair amount of water will be used in cleaning these lines and there’s a possibility that water may backup into your unit. Hopefully this does not happen and they are taking every precaution to prevent this.
As a precaution, if you are doing any work in your unit and you have any sewer pipes disconnected (kitchen work, cabinets, etc) I would advise that you cap those lines or any other exposed water line in your unit.
Thanking you in advance;
The Management