Many things are happening, as seen (if you are here) we’ve redone all the broken sidewalks at the east end of the complex. It really looks good and should last a long time. It was replaced with concrete that is 4-6 inches thick and should hold up much better. The parking lot canopy was inspected by Osborne Engineering and any issues that were found were corrected and repaired.

We’ve recently had two inspections.

The first inspection was to determine all the repairs needed on the balconies of the North Side of the South building. This inspection was performed by Keystone Engineering and hopefully we will get the results of that inspection with the next several weeks.

The second inspection was also conducted by Keystone engineering but it was called the Milestone Inspection. This is the inspection required by the state to determine the condition of our buildings. The inspection went well and they indicated that we would get our certification within several weeks and the buildings were solid.

Leave a Comment